
The “RSB 370++/4(5)” will be located as finishing unit in a SBQ and wire rod combined mill. © Friedrich Kocks
The “RSB 370++/4(5)” will be located as finishing unit in a SBQ and wire rod combined mill. © Friedrich Kocks
The site will be North America’s most modern and efficient silicon metal plant, a greenfield development for Sinova Global to deliver on the promise of a sustainable energy future. © Tenova
In the frame of its decarbonization plan through an innovative DRI program, Arcelor Mittal chooses Tenova for the supply of the DRI technology for its Dofasco plant in Canada. © Tenova
Contract signing by Antonio Catalano, Tenova Executive Vice President (on the left), and David Paterson, Chief Executive Officer at Latrobe Magnesium Limited (on the right). © Tenova
Shanghai Electric announced that Phase B of the 900-MW fifth phase of the Mohammed bin Rashid Al Maktoum Solar Park has entered operation. © Shanghai Electric