Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

22/08/2024 – More than 20 heats per day after just four days

Short ramp-up period

U.S. steel producer NLMK Indiana has started up a 118-ton electric arc furnace, revamped by Primetals Technologies, at its steel plant in Portage, Indiana, U.S.A. The total shutdown time spanned six weeks until the first heat.

EAF-NLMK.jpg

The 118-ton EAF, revamped by Primetals Technologies, at the first heat. © Primetals

 
EAF-NLMK.jpg

The 118-ton EAF, revamped by Primetals Technologies, at the first heat. © Primetals

 
Back to article

Further articles for:

  • electric arc furnance
  • Orders
  • Primetals
Jörg Dambock
Editor-in-chief

Jörg Dambock

Primetals Technologies Austria GmbH

  Show company
  • Most read
  • Latest

18/07/2025

Increase in production capacities for billets and blooms

Izmir Demir Çelik Sanayi uses “Concast” continuous caster

By  Jörg Dambock

23/07/2025

Final acceptance certificate

Primetals elevates Outokumpu’s meltshop and caster performance

By  Jörg Dambock

16/07/2025

Maegma Minerals partners with Primetals

Midrex flex plant

By  Jörg Dambock

12/02/2025

Acquisition of International Industrial Springs

Lesjöfors Group expands into India

By  Jörg Dambock

21/07/2025

On our own account - WIRE

Review of the industry - week 29/2025

By  Daniel Keienburg

25/07/2025

Order from Jindal Shadeed Iron+Steel LLC in Oman

Modernization and expansion of eight-strand Concast billet caster

By  Jörg Dambock

24/07/2025

Services and logistical support

Welding wire service centre

By  Jörg Dambock

23/07/2025

Final acceptance certificate

Primetals elevates Outokumpu’s meltshop and caster performance

By  Jörg Dambock

21/07/2025

On our own account - WIRE

Review of the industry - week 29/2025

By  Daniel Keienburg

18/07/2025

Increase in production capacities for billets and blooms

Izmir Demir Çelik Sanayi uses “Concast” continuous caster

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo